Scheduled maintenance
Network fabric upgrade — EU Central
Leaf switches in EU Central (Frankfurt) will be upgraded pair by pair. Each rack loses one of its two uplinks for a few minutes; traffic continues on the other.
- Status
- CompletedCompleted — last update 15 Apr 2025, 03:09 UTC
- Started
- 15 Apr, 01:00Tuesday 15 April 2025 UTC
- Duration
- 2 h 9 minEnded 15 Apr 2025, 03:09 UTC
- Components
- 1Network and public IPs — EU Central (Frankfurt)
Timeline
The window, as announced and as it ran.
Completed3 updates · UTC
- CompletedThe maintenance is complete and every component is back to normal operation.15 Apr, 03:09
- In progressThe maintenance window has started.15 Apr, 01:00
- ScheduledLeaf switches in EU Central (Frankfurt) will be upgraded pair by pair. Each rack loses one of its two uplinks for a few minutes; traffic continues on the other. Expected impact: Up to 30 seconds of packet loss per rack, twice, when links fail over.8 Apr, 01:00
Affected components
- Network and public IPsEU Central · FrankfurtOperational
Details
- Type
- Scheduled maintenance
- Started
- 15 Apr 2025, 01:00 UTC
- Ended
- 15 Apr 2025, 03:09 UTC
- Region
- EU Central (Frankfurt)
- Expected impact
- Up to 30 seconds of packet loss per rack, twice, when links fail over.
- Reference
- 57725b9c279e